Wisconsin · investor-owned utility

Madison Gas and Electric (MGE): power factor rules

Ordinary commercial and industrial customers have no power-factor charge. One transmission-voltage interruptible schedule adjusts billed demand if low power factor isn't corrected after notice.

Power-factor rule confirmed Tariffs checked 2026-10-03

Smaller customers

Cg-2, Cg-4, Cg-5 and Cg-6 have no power-factor billing provision. MGE's service rules do set power-factor requirements for some equipment, such as motors over 100 hp.

The power-factor rule

Cp-1 C&I High Load Factor Direct Control Interruptible Service for Transmission Voltage

Applies to: Service at 69 kV or higher, interruptible demand above 10,000 kW, annual load factor of at least 90%.

How it works: After written notice, if corrective equipment isn't installed within 240 days, on-peak billed demand is scaled by 85% divided by the actual power factor.

Formula: Billed on-peak kW = registered on-peak kW × (0.85 / actual PF).

"the measured on-peak kW demands used for billing purposes thereafter will be determined by multiplying the registered on-peak demand in kW by the ratio: 85 percent/actual power factor."

Source: Madison Gas and Electric Company – Electric Rates and Rules, Electric Volume 4, Schedule Cp-1, Sheet E-4.6.1, Determination of Demand item 3. Sheet E-4.6.1 effective January 1, 2021. Checked 2026-10-03; review by 2027-10-03.

What to do next

Cities we serve in Madison Gas and Electric (MGE) territory

Tariffs change. This summary reflects the documents cited above as checked on 2026-10-03; your utility's current rate schedule and your bill govern what you pay.